I am not quite sure of this:
When I throw one engineer to build road, after some while, another engineer join in the building, is the work re-calculated by "the remaining work / 2"?
Another scenario: Say a square needs 5 turns for 1 engineer to build a road. If I build the road for 3 turns, and then walk away the engineer. After some while, can I go back to build the road in 2 turns?
I am not quite sure of this. Maybe I can do some experiment later.
When I throw one engineer to build road, after some while, another engineer join in the building, is the work re-calculated by "the remaining work / 2"?
Another scenario: Say a square needs 5 turns for 1 engineer to build a road. If I build the road for 3 turns, and then walk away the engineer. After some while, can I go back to build the road in 2 turns?
I am not quite sure of this. Maybe I can do some experiment later.