I still owe the detailed defense plan, I need to check if I can work on it this weekend.
118 instead of 120 as expected meaning the projects bring 48 instead of 49 points. We are still on track though for next turn ...
Or are we?
What is this, let me check the numbers again, 2 turns ago we could have one turned our IZ project with full production mode. I decided to just barely miss the completion to overflow into the next 2 projects at GM.
District projects cost 214
we would have finished it with 159.2
so I switched away one mine 5
to get down to 153.8
. That means:
- T174 X/214 +153.8
(will just barely not finish the IZ project, maximum 5.4
lower than 214)
- T175 >=208.6/214 +153.8
- T176 >=148.2/214 +153.8
(IZ project finished)
- T177 >=88/214 +153.8
=241.8/214
(IZ project finished)
- T178 IZ should finished with >=28
overflow, so we are easily compensating any rounding/display errors as well as the projects becoming more expensive
Instead the game shows us that we have T177:
- 0 Overflow (which I believe is normal due to the programming never showing overflow)
- that we will finish about half of the project (visual indicator) even though one turn of production from 0 brings >70% of the project production
- the game indicates 2 turns to finish the project (this is actually normally correctly including overflow, so this is what is really worrying me)
I am not sure if this is only a display bug or if there is something else going on in the background. I fear that we might have lost the overflow due to either a bug or another undocumented mechanic in this game which limits overflow for a couple of turns.
Naturally Woden is working his IZ project instead of repairing his Coal Power Plant, depending on Overflow I think he finishes it either in 2 turns or in 3 (he needs 210
Osgiliath produces 63 so needs 4 turns
total outside of having 21
overflow.
If the display is correct we finish in 2 turns (instead of next turn) as well which would loose the race due to turn order if Woden can finish his on time.
Else I am waiting for Isaac to finish its MA to start buying units, that fits quite well with my current time contstraint regarding the exact unit plan.
I think we have to decide between corps for better defence and amout of units for projecting power as well as zone control